BHA Gold Project - Bahia, Brazil
Back to Projects
Bahia, Brazil

BHA Gold Project - Bahia, Brazil

Back

Document Dossier Summary

EXECUTIVE CONTENT OVERVIEW

3 SECTIONS

Select any section below to jump directly to detailed findings:

Resource & Reserve Inventory

CategoryTonnes Gold (t Au)Contained Ounces (oz Au)Classification Authority
Measured Resource8.191 t263,345 ozCBPM Certified
Indicated Resource8.000 t257,205 ozCBPM Certified
Inferred Resource26.052 t837,585 ozCBPM Certified
Proven / Homologated Reserve68.000 t2,186,000 ozFederal Official Gazette Gazetted
Homologated Gold Reserves and Resources certified by the State Geological Survey (CBPM) and gazetted in the Federal Official Gazette.

Project Specifications & Technical Parameters

ParameterProject Specifications
Location & SettingJacobina Mountain Gold Belt, Bahia, Brazil; ~380 km from Salvador via BR-324/116/BA-131; 17 km from Yamana Gold Complex
Property Size & Rights300.00 continuous hectares in SIGMINE; 100% owned freehold rural property with zero third-party royalties or lease liabilities
CommoditiesGold (Au) primary metal with high-purity industrial quartz as secondary co-product
Regional Host Grade2.0 to 3.0 g/t Au (regional host quartzite/conglomerate)
High-Grade ShootsUp to 5.0 g/t Au in structured quartz-mylonite vein shoots
Underground Channel Assays4.50 to 16.97 g/t Au raw mean (3.40 to 15.40 g/t Au capped at 50 ppm)
Bulk Pilot Head Grade9.44 g/t Au run-of-mine recovery
Drilling CampaignCBPM diamond rotary core drilling to >300 m; >1,145 fire assays; 89%–100% recovery; 100% core library intact on-site
Exploration CompletedStratigraphic mapping (Rio do Ouro & Serra do Córrego formations), deep core drilling, underground galleries/shafts channel sampling, bulk pilot
Metallurgical Validation30-tonne (30,000 kg) ROM pilot sample yielded 283.2 g fine gold via gravity + cyanidation; simple non-refractory free-milling ore
BHA Gold Project — Technical, Geological, and Operational Summary

Key Mining Considerations & Project Upside

  • Turnkey Regulatory De-Risking: Full Mining Concession Decree officially gazetted and in full force, eliminating licensing bottlenecks. Up-to-date Annual Mining Reports (RAL) and fully approved Municipal Land Use permits.
  • Significant M&A Arbitrage: Asking price of US$ 130M represents ~2.48% of gross in-situ value (US$ 5.24B base at US$ 2,400/oz Au), offering tremendous valuation re-rating potential.
  • Dual-Method Mining Flexibility: Licensed for both open-pit extraction (shallow supergene/oxidized ore with a low 2.0:1 strip ratio) and selective underground mechanized stoping (Cut-and-Fill / Sublevel Stoping) in competent quartzite country rock.
  • Modern Flowsheet with Zero Tailings Dams: Engineered for a modular 300 to 1,000 tpd Gravity + CIL/CIP plant achieving >92–94% gold recoveries. Incorporates filter presses and dry-stack tailings, completely bypassing geotechnical and regulatory dam liabilities.
  • Exceptional Exploration Expansion: Current 68 t reserve is strictly delineated within the upper 300 m. Regional deposits on the Jacobina belt routinely continue past 1,000 m depth. A proposed 10,000 m Phase 1 drilling program (3,000 m infill, 5,000 m deep step-out, 2,000 m strike) is scoped to upgrade reserves to NI 43-101 / JORC standards.
  • Turnkey Infrastructure & Fleet: Site includes debt-free earthmoving fleet (hydraulic excavators and dump trucks), established base camp buildings, access roads, perennial river water concessions, and nearby high-voltage grid power.

Location Context

Open in Google Maps

Quick Facts

  • Asset NameBHA Gold Project
  • LocationJacobina Mountain Gold Belt, Bahia, Brazil (~380 km from Salvador)
  • Land Tenure300.00 ha fully gazetted homologated mining concession (SIGMINE registered, 100% freehold)
  • Primary CommoditiesGold (Au) with high-purity industrial quartz co-product
  • Contained Gold68 tonnes (~2,186,000 oz Au) homologated reserve (CBPM certified)
  • Resource ClassesMeasured: 263k oz | Indicated: 257k oz | Inferred: 838k oz | Proven: 2.186M oz
  • GradesRegional Host: 2.0–3.0 g/t | Shoots: Up to 5.0 g/t | Pilot Head Grade: 9.44 g/t Au
  • Strategic Adjacency17 km from Yamana Gold Complex (Pan American Silver) on strike
  • Asking PriceUS$ 130M (~2.48% of gross in-situ gold value)
  • StatusShovel-Ready / Fully Gazetted Concession

Project Meta

Tags
GoldQuartzOrogenic GoldReserveShovel ReadyOpen PitUndergroundBrazilFor Sale