
EXECUTIVE CONTENT OVERVIEW
Select any section below to jump directly to detailed findings:
The Stibium Mining Opportunity represents a rare, brownfield producing mining complex located within the renowned Murchison Greenstone Belt in Limpopo Province, South Africa. Encompassing approximately 9,500 hectares of contiguous mining lease, the property pairs an established gold production base (50+ years operational history) with a world-scale antimony endowment comprising ~10% of total known global reserves. With antimony now classified worldwide as an urgent, strategic critical mineral (essential for defense, munitions, solar glass, and grid-scale liquid metal batteries), this asset provides immediate positive cash flow alongside extraordinary geopolitical and commercial leverage.
| Metric | Details |
|---|---|
| Location | Limpopo Province, South Africa (Murchison Greenstone Belt) |
| Property Size | Approximately 9,500 hectares (active mining lease area) |
| Primary Commodities | Gold (Au) and Antimony (Sb) |
| Development Stage | Producing gold asset with 50+ years operational history; active underground & surface operations |
| Current Production Rate | TF2 tailings dump mining at 60,000 tonnes per month (60 ktpm) |
| JORC Compliant Resource (Gold) | ~1,000,000 ounces (~1.0 Moz Au) |
| JORC Compliant Resource (Antimony) | ~280,000 tonnes Sb (~10% of global known reserves) |
| Exploration Target | Expanding the antimony resource up to 1,000,000 tonnes (1.0 Mt Sb) |
| Resource Head Grades | Specific in-situ g/t and % head grades pending release of updated JORC technical report |
| Permitting & Tenure | Fully permitted and licensed for both underground operations and tailings retreatment |
| Current Ownership | 74% Seller-Owned, 26% Broad-Based BEE Partner Trust |
| Allocation Tranche | Amount (USD) | Strategic Objective |
|---|---|---|
| Longwall Shaft Development | US$60,000,000 | Development of open-pit and high-grade underground reserves via Longwall shaft infrastructure |
| Exploration & Shaft Rehabilitation | US$10,000,000 | Diamond drilling to expand Sb resource to 1 Mt and re-opening historical production shafts |
| Proprietary Extraction Tech | US$10,000,000 | Refining and patenting proprietary tailings recovery technology (55%+ recovery benchmark) |
| Total Capital Raise | US$80,000,000 | Minority equity (~18%) or repayable debt structure with commercial offtake rights |

Limpopo Province Regional Setting

Limpopo Province Terrain and Mining Corridor